{"id":128774,"date":"2026-11-24T14:56:28","date_gmt":"2026-11-24T20:56:28","guid":{"rendered":"https:\/\/www.albert.io\/blog\/?p=128774"},"modified":"2026-11-24T14:56:28","modified_gmt":"2026-11-24T20:56:28","slug":"earth-science-design-simulations-worksheets","status":"publish","type":"post","link":"https:\/\/www.albert.io\/blog\/earth-science-design-simulations-worksheets\/","title":{"rendered":"Design Simulations Worksheets for Earth Science"},"content":{"rendered":"<p>These design simulations worksheets for Earth Science give high school students 30 questions at three levels on using computer simulations to test solutions before they&#8217;re built. Students compare four simulated traffic plans on commute time, CO2, ridership and cost, use repeated flood runs to size a levee and find where a simulation&#8217;s assumptions could break down. The printable PDF is free, and the answer key is emailed to you.<\/p>\n<section class=\"ashq-widget\" id=\"ashq-sci-HS-ETS1-4\" data-code=\"sci:HS-ETS1-4\"><div class=\"ashq-head\"><div><p class=\"ashq-eyebrow\">Earth and Space Science \u00b7 NGSS HS-ETS1-4<\/p><h2 class=\"ashq-title\">Design Simulations Worksheet<\/h2><p class=\"ashq-meta\">3 levels \u00b7 30 problems \u00b7 printable PDF<\/p><\/div><a class=\"ashq-btn ashq-btn-primary\" href=\"https:\/\/www.albert.io\/blog\/wp-json\/ashq\/v1\/pdf\/sci%3AHS-ETS1-4\" rel=\"nofollow\" data-ashq-dl>Download the free PDF<\/a><\/div><div class=\"ashq-tabs\" role=\"tablist\"><button type=\"button\" role=\"tab\" class=\"ashq-tab is-on\" aria-selected=\"true\" data-level=\"practice\">Practice <span>10<\/span><\/button><button type=\"button\" role=\"tab\" class=\"ashq-tab\" aria-selected=\"false\" data-level=\"on_level\">On Level <span>10<\/span><\/button><button type=\"button\" role=\"tab\" class=\"ashq-tab\" aria-selected=\"false\" data-level=\"challenge\">Challenge <span>10<\/span><\/button><\/div><div class=\"ashq-panel\" role=\"tabpanel\" data-level=\"practice\"><h3 class=\"ashq-level\">Practice: Builds the skill step by step.<\/h3><ol class=\"ashq-items\"><li class=\"ashq-item\" value=\"1\"><div class=\"ashq-prompt\">Why do engineers use computer simulations before building a large solution?<\/div><div class=\"ashq-choices\"><div class=\"ashq-choice\"><span class=\"ashq-letter\">A.<\/span><span>Because simulations are always perfectly correct<\/span><\/div><div class=\"ashq-choice\"><span class=\"ashq-letter\">B.<\/span><span>To avoid having any criteria<\/span><\/div><div class=\"ashq-choice\"><span class=\"ashq-letter\">C.<\/span><span>To test how the solution affects the whole system cheaply and safely before spending money<\/span><\/div><div class=\"ashq-choice\"><span class=\"ashq-letter\">D.<\/span><span>Because real tests are never allowed<\/span><\/div><\/div><\/li><li class=\"ashq-item\" value=\"2\"><div class=\"ashq-prompt\">Use the table. Which plan gives the shortest average commute?<\/div><table class=\"ashq-data\"><thead><tr><th>Simulated plan for a downtown<\/th><th>Average commute (minutes)<\/th><th>Bus riders per day<\/th><th>CO2 from traffic (tonnes per day)<\/th><th>Cost (million dollars)<\/th><\/tr><\/thead><tbody><tr><td>Current streets<\/td><td>32<\/td><td>8,000<\/td><td>400<\/td><td>0<\/td><\/tr><tr><td>Add a bus-only lane<\/td><td>34<\/td><td>14,000<\/td><td>340<\/td><td>5<\/td><\/tr><tr><td>Add a car lane<\/td><td>29<\/td><td>7,000<\/td><td>460<\/td><td>40<\/td><\/tr><tr><td>Congestion fee for cars<\/td><td>27<\/td><td>15,000<\/td><td>300<\/td><td>2<\/td><\/tr><\/tbody><\/table><div class=\"ashq-choices\"><div class=\"ashq-choice\"><span class=\"ashq-letter\">A.<\/span><span>Congestion fee for cars<\/span><\/div><div class=\"ashq-choice\"><span class=\"ashq-letter\">B.<\/span><span>Add a car lane<\/span><\/div><div class=\"ashq-choice\"><span class=\"ashq-letter\">C.<\/span><span>Add a bus-only lane<\/span><\/div><div class=\"ashq-choice\"><span class=\"ashq-letter\">D.<\/span><span>Current streets<\/span><\/div><\/div><\/li><li class=\"ashq-item\" value=\"3\"><div class=\"ashq-prompt\">Use the table. Which plan increases CO2 from traffic?<\/div><table class=\"ashq-data\"><thead><tr><th>Simulated plan for a downtown<\/th><th>Average commute (minutes)<\/th><th>Bus riders per day<\/th><th>CO2 from traffic (tonnes per day)<\/th><th>Cost (million dollars)<\/th><\/tr><\/thead><tbody><tr><td>Current streets<\/td><td>32<\/td><td>8,000<\/td><td>400<\/td><td>0<\/td><\/tr><tr><td>Add a bus-only lane<\/td><td>34<\/td><td>14,000<\/td><td>340<\/td><td>5<\/td><\/tr><tr><td>Add a car lane<\/td><td>29<\/td><td>7,000<\/td><td>460<\/td><td>40<\/td><\/tr><tr><td>Congestion fee for cars<\/td><td>27<\/td><td>15,000<\/td><td>300<\/td><td>2<\/td><\/tr><\/tbody><\/table><div class=\"ashq-choices\"><div class=\"ashq-choice\"><span class=\"ashq-letter\">A.<\/span><span>None of the plans<\/span><\/div><div class=\"ashq-choice\"><span class=\"ashq-letter\">B.<\/span><span>Add a car lane<\/span><\/div><div class=\"ashq-choice\"><span class=\"ashq-letter\">C.<\/span><span>Congestion fee for cars<\/span><\/div><div class=\"ashq-choice\"><span class=\"ashq-letter\">D.<\/span><span>Add a bus-only lane<\/span><\/div><\/div><\/li><li class=\"ashq-item\" value=\"4\"><div class=\"ashq-prompt\">Use the table. How many more bus riders per day does the bus-only lane bring compared with current streets?<\/div><table class=\"ashq-data\"><thead><tr><th>Simulated plan for a downtown<\/th><th>Average commute (minutes)<\/th><th>Bus riders per day<\/th><th>CO2 from traffic (tonnes per day)<\/th><th>Cost (million dollars)<\/th><\/tr><\/thead><tbody><tr><td>Current streets<\/td><td>32<\/td><td>8,000<\/td><td>400<\/td><td>0<\/td><\/tr><tr><td>Add a bus-only lane<\/td><td>34<\/td><td>14,000<\/td><td>340<\/td><td>5<\/td><\/tr><tr><td>Add a car lane<\/td><td>29<\/td><td>7,000<\/td><td>460<\/td><td>40<\/td><\/tr><tr><td>Congestion fee for cars<\/td><td>27<\/td><td>15,000<\/td><td>300<\/td><td>2<\/td><\/tr><\/tbody><\/table><\/li><li class=\"ashq-item\" value=\"5\"><div class=\"ashq-prompt\">Use the table. By how many tonnes per day does the congestion fee cut CO2 compared with current streets?<\/div><table class=\"ashq-data\"><thead><tr><th>Simulated plan for a downtown<\/th><th>Average commute (minutes)<\/th><th>Bus riders per day<\/th><th>CO2 from traffic (tonnes per day)<\/th><th>Cost (million dollars)<\/th><\/tr><\/thead><tbody><tr><td>Current streets<\/td><td>32<\/td><td>8,000<\/td><td>400<\/td><td>0<\/td><\/tr><tr><td>Add a bus-only lane<\/td><td>34<\/td><td>14,000<\/td><td>340<\/td><td>5<\/td><\/tr><tr><td>Add a car lane<\/td><td>29<\/td><td>7,000<\/td><td>460<\/td><td>40<\/td><\/tr><tr><td>Congestion fee for cars<\/td><td>27<\/td><td>15,000<\/td><td>300<\/td><td>2<\/td><\/tr><\/tbody><\/table><\/li><li class=\"ashq-item\" value=\"6\"><div class=\"ashq-prompt\">In the simulation, adding a car lane also changes bus ridership. What does this show?<\/div><div class=\"ashq-choices\"><div class=\"ashq-choice\"><span class=\"ashq-letter\">A.<\/span><span>Bus riders never change their plans.<\/span><\/div><div class=\"ashq-choice\"><span class=\"ashq-letter\">B.<\/span><span>Simulations ignore people.<\/span><\/div><div class=\"ashq-choice\"><span class=\"ashq-letter\">C.<\/span><span>Each part of a city works alone.<\/span><\/div><div class=\"ashq-choice\"><span class=\"ashq-letter\">D.<\/span><span>Changes to one part of the system affect other parts.<\/span><\/div><\/div><\/li><li class=\"ashq-item\" value=\"7\"><div class=\"ashq-prompt\">What is an input to a traffic simulation?<\/div><div class=\"ashq-choices\"><div class=\"ashq-choice\"><span class=\"ashq-letter\">A.<\/span><span>The report it produces<\/span><\/div><div class=\"ashq-choice\"><span class=\"ashq-letter\">B.<\/span><span>The commute time it predicts<\/span><\/div><div class=\"ashq-choice\"><span class=\"ashq-letter\">C.<\/span><span>The CO2 it predicts<\/span><\/div><div class=\"ashq-choice\"><span class=\"ashq-letter\">D.<\/span><span>The number of lanes on each street<\/span><\/div><\/div><\/li><li class=\"ashq-item\" value=\"8\"><div class=\"ashq-prompt\">Use the table. What is the average of the five simulated peak river levels, in meters?<\/div><table class=\"ashq-data\"><thead><tr><th>Simulation run<\/th><th>Peak river level at town (m)<\/th><\/tr><\/thead><tbody><tr><td>1<\/td><td>4.1<\/td><\/tr><tr><td>2<\/td><td>4.6<\/td><\/tr><tr><td>3<\/td><td>3.9<\/td><\/tr><tr><td>4<\/td><td>4.4<\/td><\/tr><tr><td>5<\/td><td>4.0<\/td><\/tr><\/tbody><\/table><\/li><li class=\"ashq-item\" value=\"9\"><div class=\"ashq-prompt\">Use the table. Why do the five runs give different peak levels?<\/div><table class=\"ashq-data\"><thead><tr><th>Simulation run<\/th><th>Peak river level at town (m)<\/th><\/tr><\/thead><tbody><tr><td>1<\/td><td>4.1<\/td><\/tr><tr><td>2<\/td><td>4.6<\/td><\/tr><tr><td>3<\/td><td>3.9<\/td><\/tr><tr><td>4<\/td><td>4.4<\/td><\/tr><tr><td>5<\/td><td>4.0<\/td><\/tr><\/tbody><\/table><div class=\"ashq-choices\"><div class=\"ashq-choice\"><span class=\"ashq-letter\">A.<\/span><span>The river changes its length each run.<\/span><\/div><div class=\"ashq-choice\"><span class=\"ashq-letter\">B.<\/span><span>The computer made random mistakes.<\/span><\/div><div class=\"ashq-choice\"><span class=\"ashq-letter\">C.<\/span><span>Each run uses slightly different rainfall and conditions to show the range of possible outcomes.<\/span><\/div><div class=\"ashq-choice\"><span class=\"ashq-letter\">D.<\/span><span>Only run 1 is correct.<\/span><\/div><\/div><\/li><li class=\"ashq-item\" value=\"10\"><div class=\"ashq-prompt\">Use the traffic table. Name one criterion the bus-only lane meets well and one it does poorly on. Make two points.<\/div><table class=\"ashq-data\"><thead><tr><th>Simulated plan for a downtown<\/th><th>Average commute (minutes)<\/th><th>Bus riders per day<\/th><th>CO2 from traffic (tonnes per day)<\/th><th>Cost (million dollars)<\/th><\/tr><\/thead><tbody><tr><td>Current streets<\/td><td>32<\/td><td>8,000<\/td><td>400<\/td><td>0<\/td><\/tr><tr><td>Add a bus-only lane<\/td><td>34<\/td><td>14,000<\/td><td>340<\/td><td>5<\/td><\/tr><tr><td>Add a car lane<\/td><td>29<\/td><td>7,000<\/td><td>460<\/td><td>40<\/td><\/tr><tr><td>Congestion fee for cars<\/td><td>27<\/td><td>15,000<\/td><td>300<\/td><td>2<\/td><\/tr><\/tbody><\/table><\/li><\/ol><\/div><div class=\"ashq-panel\" role=\"tabpanel\" data-level=\"on_level\" data-hidden><h3 class=\"ashq-level\">On Level: Grade-level practice.<\/h3><ol class=\"ashq-items\"><li class=\"ashq-item\" value=\"1\"><div class=\"ashq-prompt\">Use the table. For the congestion fee, how many tonnes of CO2 per day are cut for each million dollars of cost?<\/div><table class=\"ashq-data\"><thead><tr><th>Simulated plan for a downtown<\/th><th>Average commute (minutes)<\/th><th>Bus riders per day<\/th><th>CO2 from traffic (tonnes per day)<\/th><th>Cost (million dollars)<\/th><\/tr><\/thead><tbody><tr><td>Current streets<\/td><td>32<\/td><td>8,000<\/td><td>400<\/td><td>0<\/td><\/tr><tr><td>Add a bus-only lane<\/td><td>34<\/td><td>14,000<\/td><td>340<\/td><td>5<\/td><\/tr><tr><td>Add a car lane<\/td><td>29<\/td><td>7,000<\/td><td>460<\/td><td>40<\/td><\/tr><tr><td>Congestion fee for cars<\/td><td>27<\/td><td>15,000<\/td><td>300<\/td><td>2<\/td><\/tr><\/tbody><\/table><\/li><li class=\"ashq-item\" value=\"2\"><div class=\"ashq-prompt\">Use the table. For the bus-only lane, how many tonnes of CO2 per day are cut for each million dollars of cost?<\/div><table class=\"ashq-data\"><thead><tr><th>Simulated plan for a downtown<\/th><th>Average commute (minutes)<\/th><th>Bus riders per day<\/th><th>CO2 from traffic (tonnes per day)<\/th><th>Cost (million dollars)<\/th><\/tr><\/thead><tbody><tr><td>Current streets<\/td><td>32<\/td><td>8,000<\/td><td>400<\/td><td>0<\/td><\/tr><tr><td>Add a bus-only lane<\/td><td>34<\/td><td>14,000<\/td><td>340<\/td><td>5<\/td><\/tr><tr><td>Add a car lane<\/td><td>29<\/td><td>7,000<\/td><td>460<\/td><td>40<\/td><\/tr><tr><td>Congestion fee for cars<\/td><td>27<\/td><td>15,000<\/td><td>300<\/td><td>2<\/td><\/tr><\/tbody><\/table><\/li><li class=\"ashq-item\" value=\"3\"><div class=\"ashq-prompt\">Use the table. The city's criteria are: commute no longer than 33 minutes, CO2 under 350 tonnes per day, cost under 10 million dollars. Which plan meets all three?<\/div><table class=\"ashq-data\"><thead><tr><th>Simulated plan for a downtown<\/th><th>Average commute (minutes)<\/th><th>Bus riders per day<\/th><th>CO2 from traffic (tonnes per day)<\/th><th>Cost (million dollars)<\/th><\/tr><\/thead><tbody><tr><td>Current streets<\/td><td>32<\/td><td>8,000<\/td><td>400<\/td><td>0<\/td><\/tr><tr><td>Add a bus-only lane<\/td><td>34<\/td><td>14,000<\/td><td>340<\/td><td>5<\/td><\/tr><tr><td>Add a car lane<\/td><td>29<\/td><td>7,000<\/td><td>460<\/td><td>40<\/td><\/tr><tr><td>Congestion fee for cars<\/td><td>27<\/td><td>15,000<\/td><td>300<\/td><td>2<\/td><\/tr><\/tbody><\/table><div class=\"ashq-choices\"><div class=\"ashq-choice\"><span class=\"ashq-letter\">A.<\/span><span>Add a bus-only lane<\/span><\/div><div class=\"ashq-choice\"><span class=\"ashq-letter\">B.<\/span><span>Congestion fee for cars<\/span><\/div><div class=\"ashq-choice\"><span class=\"ashq-letter\">C.<\/span><span>Add a car lane<\/span><\/div><div class=\"ashq-choice\"><span class=\"ashq-letter\">D.<\/span><span>Current streets<\/span><\/div><\/div><\/li><li class=\"ashq-item\" value=\"4\"><div class=\"ashq-prompt\">Use the table. Adding a car lane shortens commutes, but it also changes other parts of the system. Make two points: what happened to bus ridership and why, and what happened to CO2 and why.<\/div><table class=\"ashq-data\"><thead><tr><th>Simulated plan for a downtown<\/th><th>Average commute (minutes)<\/th><th>Bus riders per day<\/th><th>CO2 from traffic (tonnes per day)<\/th><th>Cost (million dollars)<\/th><\/tr><\/thead><tbody><tr><td>Current streets<\/td><td>32<\/td><td>8,000<\/td><td>400<\/td><td>0<\/td><\/tr><tr><td>Add a bus-only lane<\/td><td>34<\/td><td>14,000<\/td><td>340<\/td><td>5<\/td><\/tr><tr><td>Add a car lane<\/td><td>29<\/td><td>7,000<\/td><td>460<\/td><td>40<\/td><\/tr><tr><td>Congestion fee for cars<\/td><td>27<\/td><td>15,000<\/td><td>300<\/td><td>2<\/td><\/tr><\/tbody><\/table><\/li><li class=\"ashq-item\" value=\"5\"><div class=\"ashq-prompt\">A simulation of a new dam shows it would cut floods downstream but also trap sediment and shrink a delta. What does this show about the solution?<\/div><div class=\"ashq-choices\"><div class=\"ashq-choice\"><span class=\"ashq-letter\">A.<\/span><span>It has effects on other systems, so trade-offs must be weighed.<\/span><\/div><div class=\"ashq-choice\"><span class=\"ashq-letter\">B.<\/span><span>The dam has no drawbacks.<\/span><\/div><div class=\"ashq-choice\"><span class=\"ashq-letter\">C.<\/span><span>Simulations can't model sediment.<\/span><\/div><div class=\"ashq-choice\"><span class=\"ashq-letter\">D.<\/span><span>Floods and deltas are unrelated.<\/span><\/div><\/div><\/li><li class=\"ashq-item\" value=\"6\"><div class=\"ashq-prompt\">Use the table in P8. A levee is designed to hold back water up to 4.5 m. In how many of the five runs would the river go over it?<\/div><table class=\"ashq-data\"><thead><tr><th>Simulation run<\/th><th>Peak river level at town (m)<\/th><\/tr><\/thead><tbody><tr><td>1<\/td><td>4.1<\/td><\/tr><tr><td>2<\/td><td>4.6<\/td><\/tr><tr><td>3<\/td><td>3.9<\/td><\/tr><tr><td>4<\/td><td>4.4<\/td><\/tr><tr><td>5<\/td><td>4.0<\/td><\/tr><\/tbody><\/table><\/li><li class=\"ashq-item\" value=\"7\"><div class=\"ashq-prompt\">Use O6. In what percent of the runs does the levee hold?<\/div><table class=\"ashq-data\"><thead><tr><th>Simulation run<\/th><th>Peak river level at town (m)<\/th><\/tr><\/thead><tbody><tr><td>1<\/td><td>4.1<\/td><\/tr><tr><td>2<\/td><td>4.6<\/td><\/tr><tr><td>3<\/td><td>3.9<\/td><\/tr><tr><td>4<\/td><td>4.4<\/td><\/tr><tr><td>5<\/td><td>4.0<\/td><\/tr><\/tbody><\/table><\/li><li class=\"ashq-item\" value=\"8\"><div class=\"ashq-prompt\">Use O6 and O7. The town wants the levee to hold in every run. What should the designers do next?<\/div><table class=\"ashq-data\"><thead><tr><th>Simulation run<\/th><th>Peak river level at town (m)<\/th><\/tr><\/thead><tbody><tr><td>1<\/td><td>4.1<\/td><\/tr><tr><td>2<\/td><td>4.6<\/td><\/tr><tr><td>3<\/td><td>3.9<\/td><\/tr><tr><td>4<\/td><td>4.4<\/td><\/tr><tr><td>5<\/td><td>4.0<\/td><\/tr><\/tbody><\/table><div class=\"ashq-choices\"><div class=\"ashq-choice\"><span class=\"ashq-letter\">A.<\/span><span>Lower the levee to 4.0 m<\/span><\/div><div class=\"ashq-choice\"><span class=\"ashq-letter\">B.<\/span><span>Raise the design height above 4.6 m and run the simulation again<\/span><\/div><div class=\"ashq-choice\"><span class=\"ashq-letter\">C.<\/span><span>Stop using the simulation<\/span><\/div><div class=\"ashq-choice\"><span class=\"ashq-letter\">D.<\/span><span>Delete run 2<\/span><\/div><\/div><\/li><li class=\"ashq-item\" value=\"9\"><div class=\"ashq-prompt\">Why must engineers check a simulation against real-world data?<\/div><div class=\"ashq-choices\"><div class=\"ashq-choice\"><span class=\"ashq-letter\">A.<\/span><span>A simulation is only useful if it reproduces what actually happens.<\/span><\/div><div class=\"ashq-choice\"><span class=\"ashq-letter\">B.<\/span><span>Real data always matches any simulation.<\/span><\/div><div class=\"ashq-choice\"><span class=\"ashq-letter\">C.<\/span><span>Simulations never need checking.<\/span><\/div><div class=\"ashq-choice\"><span class=\"ashq-letter\">D.<\/span><span>Real data is always wrong.<\/span><\/div><\/div><\/li><li class=\"ashq-item\" value=\"10\"><div class=\"ashq-prompt\">A simulation predicts a solar canopy over a parking lot makes 1,200 MWh a year and cuts the lot's summer temperature by 4 \u00b0C. If the city buys electricity at 90 dollars per MWh, how many dollars a year does the canopy save?<\/div><\/li><\/ol><\/div><div class=\"ashq-panel\" role=\"tabpanel\" data-level=\"challenge\" data-hidden><h3 class=\"ashq-level\">Challenge: Multi-step and word problems that stretch it.<\/h3><ol class=\"ashq-items\"><li class=\"ashq-item\" value=\"1\"><div class=\"ashq-prompt\">Use the traffic table. Recommend one plan for the city, using at least two criteria and one constraint. Make two points.<\/div><table class=\"ashq-data\"><thead><tr><th>Simulated plan for a downtown<\/th><th>Average commute (minutes)<\/th><th>Bus riders per day<\/th><th>CO2 from traffic (tonnes per day)<\/th><th>Cost (million dollars)<\/th><\/tr><\/thead><tbody><tr><td>Current streets<\/td><td>32<\/td><td>8,000<\/td><td>400<\/td><td>0<\/td><\/tr><tr><td>Add a bus-only lane<\/td><td>34<\/td><td>14,000<\/td><td>340<\/td><td>5<\/td><\/tr><tr><td>Add a car lane<\/td><td>29<\/td><td>7,000<\/td><td>460<\/td><td>40<\/td><\/tr><tr><td>Congestion fee for cars<\/td><td>27<\/td><td>15,000<\/td><td>300<\/td><td>2<\/td><\/tr><\/tbody><\/table><\/li><li class=\"ashq-item\" value=\"2\"><div class=\"ashq-prompt\">A simulation predicts the congestion fee works, but it assumes drivers have good bus options. What should the city check?<\/div><div class=\"ashq-choices\"><div class=\"ashq-choice\"><span class=\"ashq-letter\">A.<\/span><span>Whether cars can be painted different colors<\/span><\/div><div class=\"ashq-choice\"><span class=\"ashq-letter\">B.<\/span><span>Whether the fee is easy to pronounce<\/span><\/div><div class=\"ashq-choice\"><span class=\"ashq-letter\">C.<\/span><span>Whether the simulation's font is readable<\/span><\/div><div class=\"ashq-choice\"><span class=\"ashq-letter\">D.<\/span><span>Whether the bus system can carry the extra 7,000 riders a day<\/span><\/div><\/div><\/li><li class=\"ashq-item\" value=\"3\"><div class=\"ashq-prompt\">Use the traffic table. If the bus system can only add 4,000 riders a day beyond current streets, how many of the congestion fee's projected riders could not be carried?<\/div><table class=\"ashq-data\"><thead><tr><th>Simulated plan for a downtown<\/th><th>Average commute (minutes)<\/th><th>Bus riders per day<\/th><th>CO2 from traffic (tonnes per day)<\/th><th>Cost (million dollars)<\/th><\/tr><\/thead><tbody><tr><td>Current streets<\/td><td>32<\/td><td>8,000<\/td><td>400<\/td><td>0<\/td><\/tr><tr><td>Add a bus-only lane<\/td><td>34<\/td><td>14,000<\/td><td>340<\/td><td>5<\/td><\/tr><tr><td>Add a car lane<\/td><td>29<\/td><td>7,000<\/td><td>460<\/td><td>40<\/td><\/tr><tr><td>Congestion fee for cars<\/td><td>27<\/td><td>15,000<\/td><td>300<\/td><td>2<\/td><\/tr><\/tbody><\/table><\/li><li class=\"ashq-item\" value=\"4\"><div class=\"ashq-prompt\">Use C3. Explain how a constraint in one subsystem could change the simulated outcome of the congestion fee. Make two points.<\/div><\/li><li class=\"ashq-item\" value=\"5\"><div class=\"ashq-prompt\">A wildfire simulation finds that clearing brush within 30 m of homes cuts houses lost from 120 to 45. What percent fewer houses are lost?<\/div><\/li><li class=\"ashq-item\" value=\"6\"><div class=\"ashq-prompt\">Use C5. The same simulation shows the cleared areas increase soil erosion on steep slopes. What is the best next step?<\/div><div class=\"ashq-choices\"><div class=\"ashq-choice\"><span class=\"ashq-letter\">A.<\/span><span>Ignore erosion because fewer houses burn<\/span><\/div><div class=\"ashq-choice\"><span class=\"ashq-letter\">B.<\/span><span>Stop clearing brush everywhere<\/span><\/div><div class=\"ashq-choice\"><span class=\"ashq-letter\">C.<\/span><span>Simulate a refined plan, such as leaving low ground cover on steep slopes, and compare the results<\/span><\/div><div class=\"ashq-choice\"><span class=\"ashq-letter\">D.<\/span><span>Clear brush within 300 m instead<\/span><\/div><\/div><\/li><li class=\"ashq-item\" value=\"7\"><div class=\"ashq-prompt\">Use the table in P8. If the design height is 4.7 m, in what percent of the runs does the river stay below it?<\/div><table class=\"ashq-data\"><thead><tr><th>Simulation run<\/th><th>Peak river level at town (m)<\/th><\/tr><\/thead><tbody><tr><td>1<\/td><td>4.1<\/td><\/tr><tr><td>2<\/td><td>4.6<\/td><\/tr><tr><td>3<\/td><td>3.9<\/td><\/tr><tr><td>4<\/td><td>4.4<\/td><\/tr><tr><td>5<\/td><td>4.0<\/td><\/tr><\/tbody><\/table><\/li><li class=\"ashq-item\" value=\"8\"><div class=\"ashq-prompt\">Five runs is a small sample. Why might engineers run the flood simulation 1,000 times?<\/div><div class=\"ashq-choices\"><div class=\"ashq-choice\"><span class=\"ashq-letter\">A.<\/span><span>To better estimate how often rare, extreme floods could happen<\/span><\/div><div class=\"ashq-choice\"><span class=\"ashq-letter\">B.<\/span><span>Because more runs always lower the river<\/span><\/div><div class=\"ashq-choice\"><span class=\"ashq-letter\">C.<\/span><span>To make the results exactly the same<\/span><\/div><div class=\"ashq-choice\"><span class=\"ashq-letter\">D.<\/span><span>Because 5 runs is too many<\/span><\/div><\/div><\/li><li class=\"ashq-item\" value=\"9\"><div class=\"ashq-prompt\">Describe two limitations of using a computer simulation to choose a solution. Make two points.<\/div><\/li><li class=\"ashq-item\" value=\"10\"><div class=\"ashq-prompt\">Which result from a simulation would best show interactions between systems?<\/div><div class=\"ashq-choices\"><div class=\"ashq-choice\"><span class=\"ashq-letter\">A.<\/span><span>A road gets longer when more asphalt is added.<\/span><\/div><div class=\"ashq-choice\"><span class=\"ashq-letter\">B.<\/span><span>A bus holds 60 people.<\/span><\/div><div class=\"ashq-choice\"><span class=\"ashq-letter\">C.<\/span><span>A dam is made of concrete.<\/span><\/div><div class=\"ashq-choice\"><span class=\"ashq-letter\">D.<\/span><span>Cutting a forest for a road increases runoff, which raises flood levels in a town downstream.<\/span><\/div><\/div><\/li><\/ol><\/div><div class=\"ashq-foot\"><form class=\"ashq-key\" data-ashq-key novalidate><p class=\"ashq-key-title\">Get the answer key with worked solutions<\/p><div class=\"ashq-key-row\"><label class=\"screen-reader-text\" for=\"ashq-sci-HS-ETS1-4-email\">Your email<\/label><input type=\"email\" id=\"ashq-sci-HS-ETS1-4-email\" name=\"email\" required placeholder=\"you@school.org\" autocomplete=\"email\"><input type=\"text\" name=\"website\" tabindex=\"-1\" autocomplete=\"off\" class=\"ashq-hp\" aria-hidden=\"true\"><button type=\"submit\" class=\"ashq-btn\">Email me the key<\/button><\/div><p class=\"ashq-consent\">We will email you the answer key and occasional free resources from Albert. Unsubscribe any time.<\/p><p class=\"ashq-msg\" role=\"status\" aria-live=\"polite\"><\/p><\/form><a class=\"ashq-cta\" href=\"https:\/\/www.albert.io\/adaptive-subjects\/adaptive-science-skills\">Assign free adaptive science practice in Albert \u2192<\/a><\/div><\/section>\n<h2>What HS-ETS1-4 asks students to do<\/h2>\n<blockquote><p>Use a computer simulation to model the impact of proposed solutions to a complex real-world problem with numerous criteria and constraints on interactions within and between systems relevant to the problem.<\/p><\/blockquote>\n<p>Big solutions are too expensive to build just to see if they work. Engineers use computer simulations to try them first: a traffic model shows what a new lane does to commutes, bus ridership and emissions; a flood model shows how high a river could rise. Running the model many times, with slightly different conditions, shows the range of outcomes.<\/p>\n<p>The standard asks students to use a simulation to model a solution&#8217;s impact on interactions within and between systems, against many criteria and constraints. Students should be able to read simulation output, check plans against criteria, notice effects that spread from one system to another and question the model&#8217;s assumptions.<\/p>\n<p>What mastery looks like:<\/p>\n<ul>\n<li>A student compares simulated plans on several criteria at once.<\/li>\n<li>A student checks which plans meet every criterion and constraint.<\/li>\n<li>A student explains how a change in one part of a system affects another.<\/li>\n<li>A student uses repeated runs to judge how often a design would fail.<\/li>\n<li>A student names a simulation&#8217;s assumptions and limits.<\/li>\n<\/ul>\n<h3>Key vocabulary<\/h3>\n<ul>\n<li><strong>Simulation:<\/strong> a computer model that predicts how a system behaves<\/li>\n<li><strong>Input:<\/strong> a value the user sets, such as the number of lanes<\/li>\n<li><strong>Output:<\/strong> what the simulation predicts, such as commute time<\/li>\n<li><strong>Run:<\/strong> one pass of a simulation with a given set of conditions<\/li>\n<li><strong>Assumption:<\/strong> something a model takes as true, which may not hold in reality<\/li>\n<\/ul>\n<h2>The model, step by step<\/h2>\n<p>The phenomenon: cities have added lanes to crowded highways for decades, yet traffic often fills the new lanes within a few years. Why would adding road space not fix congestion for long, and how could a city find out before spending 40 million dollars?<\/p>\n<table>\n<tr>\n<th>Simulated plan<\/th>\n<th>Average commute (minutes)<\/th>\n<th>Bus riders per day<\/th>\n<th>CO2 from traffic (tonnes per day)<\/th>\n<th>Cost (million dollars)<\/th>\n<\/tr>\n<tr>\n<td>Current streets<\/td>\n<td>32<\/td>\n<td>8,000<\/td>\n<td>400<\/td>\n<td>0<\/td>\n<\/tr>\n<tr>\n<td>Add a bus-only lane<\/td>\n<td>34<\/td>\n<td>14,000<\/td>\n<td>340<\/td>\n<td>5<\/td>\n<\/tr>\n<tr>\n<td>Add a car lane<\/td>\n<td>29<\/td>\n<td>7,000<\/td>\n<td>460<\/td>\n<td>40<\/td>\n<\/tr>\n<tr>\n<td>Congestion fee for cars<\/td>\n<td>27<\/td>\n<td>15,000<\/td>\n<td>300<\/td>\n<td>2<\/td>\n<\/tr>\n<\/table>\n<p>The science and engineering practice is using mathematics and computational thinking: running and reading a model to compare designs.<\/p>\n<ol>\n<li><strong>Claim:<\/strong> The congestion fee is the best plan in this simulation.<\/li>\n<li><strong>Evidence:<\/strong> It gives the shortest commute (27 minutes), the lowest CO2 (300 tonnes a day) and the most bus riders, for 2 million dollars. The car lane shortens commutes but raises CO2 to 460 tonnes and costs 40 million.<\/li>\n<li><strong>Reasoning:<\/strong> The model links the road system, the bus system and the atmosphere. A fee pushes some drivers onto buses, which cuts traffic and emissions together. The result depends on the assumption that buses can carry the extra 7,000 riders, so that needs checking.<\/li>\n<\/ol>\n<p>A worked question: &#8220;Five flood runs give peak river levels of 4.1, 4.6, 3.9, 4.4 and 4.0 m. A levee holds water up to 4.5 m. In what percent of runs does it hold?&#8221; Only the 4.6 m run goes over, so it holds in 4 of 5 runs, or 80%. A design height above 4.6 m holds in all five, and more runs would show how often rare floods might go higher.<\/p>\n<h3>Run a simple simulation<\/h3>\n<p>Have pairs simulate a levee with a die: each roll adds that many tenths of a meter to a base river level of 3.5 m. They roll 20 storms, record the peaks and find what percent go over a 4.0 m levee. Then they raise the levee to 4.1 m and re-run. Close by comparing 20 runs with the class total of hundreds, and talk about why rare events need many runs.<\/p>\n<h2>Common misconceptions<\/h2>\n<table>\n<tr>\n<th>Misconception<\/th>\n<th>What it looks like<\/th>\n<th>How to address it<\/th>\n<\/tr>\n<tr>\n<td>Simulations show the future exactly<\/td>\n<td>Students treat 27 minutes as a promise.<\/td>\n<td>Talk about assumptions and run-to-run variation.<\/td>\n<\/tr>\n<tr>\n<td>One run is enough<\/td>\n<td>Students design to the average flood.<\/td>\n<td>Use the five runs: designing to the average fails in some storms.<\/td>\n<\/tr>\n<tr>\n<td>Each part of a system acts alone<\/td>\n<td>Students don&#8217;t see why a car lane changes bus ridership.<\/td>\n<td>Trace the chain from lane to driving to ridership to CO2.<\/td>\n<\/tr>\n<tr>\n<td>If a model has numbers, it&#8217;s right<\/td>\n<td>Students skip checking against reality.<\/td>\n<td>Ask how the model would be tested against real traffic counts.<\/td>\n<\/tr>\n<\/table>\n<h2>How to use the three levels<\/h2>\n<p>The <strong>Practice<\/strong> level covers why engineers simulate, reading a results table and inputs versus outputs. Plan on about 15 minutes.<\/p>\n<p>The <strong>On Level<\/strong> sheet matches the standard. Students compare plans by CO2 cut per dollar, check every criterion, trace effects across systems and size a levee from repeated runs. Plan on 20 to 25 minutes.<\/p>\n<p>The <strong>Challenge<\/strong> level recommends a plan with criteria and a constraint, tests a hidden bus-capacity limit, weighs a wildfire plan&#8217;s side effects and names a simulation&#8217;s limits. It works well for small groups, early finishers or review.<\/p>\n<p>The answer key includes model answers and key points for every written question.<\/p>\n\n<h2>Keep practicing<\/h2>\n<p>For more practice that adjusts to each student, <a href=\"https:\/\/www.albert.io\/adaptive-subjects\/adaptive-science-skills\">Albert&#8217;s adaptive science practice<\/a> is free for teachers to assign, with instant feedback on every question.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Free design simulations worksheets earth science for high school: traffic and flood model results, criteria, constraints and system effects, plus a key.<\/p>\n","protected":false},"author":45,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_lmt_disableupdate":"","_lmt_disable":"","albert_practice_url":"","albert_lit_section":"analysis","albert_lit_sort_order":0,"footnotes":""},"categories":[18143],"tags":[],"class_list":["post-128774","post","type-post","status-publish","format-standard","hentry","category-earth-space-worksheets"],"acf":{"post_id":null},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.1.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Design Simulations Worksheets for Earth Science | Free PDF<\/title>\n<meta name=\"description\" content=\"Free design simulations worksheets earth science for high school: traffic and flood model results, criteria, constraints and system effects, plus a key.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.albert.io\/blog\/earth-science-design-simulations-worksheets\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Design Simulations Worksheets for Earth Science | Free PDF\" \/>\n<meta property=\"og:description\" content=\"Free design simulations worksheets earth science for high school: traffic and flood model results, criteria, constraints and system effects, plus a key.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.albert.io\/blog\/earth-science-design-simulations-worksheets\/\" \/>\n<meta property=\"og:site_name\" content=\"Albert Blog &amp; Resources\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-24T20:56:28+00:00\" \/>\n<meta name=\"author\" content=\"Lisette Santiago\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Lisette Santiago\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.albert.io\/blog\/earth-science-design-simulations-worksheets\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.albert.io\/blog\/earth-science-design-simulations-worksheets\/\"},\"author\":{\"name\":\"Lisette Santiago\",\"@id\":\"https:\/\/www.albert.io\/blog\/#\/schema\/person\/2fa1289e229fea1d23e0cb3ce3f8e242\"},\"headline\":\"Design Simulations Worksheets for Earth Science\",\"datePublished\":\"2026-11-24T20:56:28+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.albert.io\/blog\/earth-science-design-simulations-worksheets\/\"},\"wordCount\":913,\"articleSection\":[\"Earth and Space Science Worksheets\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.albert.io\/blog\/earth-science-design-simulations-worksheets\/\",\"url\":\"https:\/\/www.albert.io\/blog\/earth-science-design-simulations-worksheets\/\",\"name\":\"Design Simulations Worksheets for Earth Science | Free PDF\",\"isPartOf\":{\"@id\":\"https:\/\/www.albert.io\/blog\/#website\"},\"datePublished\":\"2026-11-24T20:56:28+00:00\",\"author\":{\"@id\":\"https:\/\/www.albert.io\/blog\/#\/schema\/person\/2fa1289e229fea1d23e0cb3ce3f8e242\"},\"description\":\"Free design simulations worksheets earth science for high school: traffic and flood model results, criteria, constraints and system effects, plus a key.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.albert.io\/blog\/earth-science-design-simulations-worksheets\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.albert.io\/blog\/earth-science-design-simulations-worksheets\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.albert.io\/blog\/earth-science-design-simulations-worksheets\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.albert.io\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Design Simulations Worksheets for Earth Science\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.albert.io\/blog\/#website\",\"url\":\"https:\/\/www.albert.io\/blog\/\",\"name\":\"Albert Blog &amp; Resources\",\"description\":\"Free resources and practice materials for students and teachers!\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.albert.io\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.albert.io\/blog\/#\/schema\/person\/2fa1289e229fea1d23e0cb3ce3f8e242\",\"name\":\"Lisette Santiago\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.albert.io\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/a09b53ad8976d360786a3997733a99597d8e77d5fc3e67de059129849bbea4ec?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/a09b53ad8976d360786a3997733a99597d8e77d5fc3e67de059129849bbea4ec?s=96&d=mm&r=g\",\"caption\":\"Lisette Santiago\"},\"url\":\"https:\/\/www.albert.io\/blog\/author\/lisetteatalbert\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Design Simulations Worksheets for Earth Science | Free PDF","description":"Free design simulations worksheets earth science for high school: traffic and flood model results, criteria, constraints and system effects, plus a key.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.albert.io\/blog\/earth-science-design-simulations-worksheets\/","og_locale":"en_US","og_type":"article","og_title":"Design Simulations Worksheets for Earth Science | Free PDF","og_description":"Free design simulations worksheets earth science for high school: traffic and flood model results, criteria, constraints and system effects, plus a key.","og_url":"https:\/\/www.albert.io\/blog\/earth-science-design-simulations-worksheets\/","og_site_name":"Albert Blog &amp; Resources","article_published_time":"2026-11-24T20:56:28+00:00","author":"Lisette Santiago","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Lisette Santiago","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.albert.io\/blog\/earth-science-design-simulations-worksheets\/#article","isPartOf":{"@id":"https:\/\/www.albert.io\/blog\/earth-science-design-simulations-worksheets\/"},"author":{"name":"Lisette Santiago","@id":"https:\/\/www.albert.io\/blog\/#\/schema\/person\/2fa1289e229fea1d23e0cb3ce3f8e242"},"headline":"Design Simulations Worksheets for Earth Science","datePublished":"2026-11-24T20:56:28+00:00","mainEntityOfPage":{"@id":"https:\/\/www.albert.io\/blog\/earth-science-design-simulations-worksheets\/"},"wordCount":913,"articleSection":["Earth and Space Science Worksheets"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.albert.io\/blog\/earth-science-design-simulations-worksheets\/","url":"https:\/\/www.albert.io\/blog\/earth-science-design-simulations-worksheets\/","name":"Design Simulations Worksheets for Earth Science | Free PDF","isPartOf":{"@id":"https:\/\/www.albert.io\/blog\/#website"},"datePublished":"2026-11-24T20:56:28+00:00","author":{"@id":"https:\/\/www.albert.io\/blog\/#\/schema\/person\/2fa1289e229fea1d23e0cb3ce3f8e242"},"description":"Free design simulations worksheets earth science for high school: traffic and flood model results, criteria, constraints and system effects, plus a key.","breadcrumb":{"@id":"https:\/\/www.albert.io\/blog\/earth-science-design-simulations-worksheets\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.albert.io\/blog\/earth-science-design-simulations-worksheets\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.albert.io\/blog\/earth-science-design-simulations-worksheets\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.albert.io\/blog\/"},{"@type":"ListItem","position":2,"name":"Design Simulations Worksheets for Earth Science"}]},{"@type":"WebSite","@id":"https:\/\/www.albert.io\/blog\/#website","url":"https:\/\/www.albert.io\/blog\/","name":"Albert Blog &amp; Resources","description":"Free resources and practice materials for students and teachers!","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.albert.io\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.albert.io\/blog\/#\/schema\/person\/2fa1289e229fea1d23e0cb3ce3f8e242","name":"Lisette Santiago","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.albert.io\/blog\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/a09b53ad8976d360786a3997733a99597d8e77d5fc3e67de059129849bbea4ec?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/a09b53ad8976d360786a3997733a99597d8e77d5fc3e67de059129849bbea4ec?s=96&d=mm&r=g","caption":"Lisette Santiago"},"url":"https:\/\/www.albert.io\/blog\/author\/lisetteatalbert\/"}]}},"modified_by":null,"_links":{"self":[{"href":"https:\/\/www.albert.io\/blog\/wp-json\/wp\/v2\/posts\/128774","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.albert.io\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.albert.io\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.albert.io\/blog\/wp-json\/wp\/v2\/users\/45"}],"replies":[{"embeddable":true,"href":"https:\/\/www.albert.io\/blog\/wp-json\/wp\/v2\/comments?post=128774"}],"version-history":[{"count":1,"href":"https:\/\/www.albert.io\/blog\/wp-json\/wp\/v2\/posts\/128774\/revisions"}],"predecessor-version":[{"id":130188,"href":"https:\/\/www.albert.io\/blog\/wp-json\/wp\/v2\/posts\/128774\/revisions\/130188"}],"wp:attachment":[{"href":"https:\/\/www.albert.io\/blog\/wp-json\/wp\/v2\/media?parent=128774"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.albert.io\/blog\/wp-json\/wp\/v2\/categories?post=128774"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.albert.io\/blog\/wp-json\/wp\/v2\/tags?post=128774"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}