These free scatter plots and line of best fit worksheets for Algebra 1 cover standard S-ID.B.6 with 30 problems across three levels. Students describe scatter plots, use a line of best fit to make predictions, compute residuals and judge fit, and apply exponential and quadratic models to data. Print the PDF, then enter your email under the problems to get the answer key with worked solutions.
What S-ID.B.6 asks students to do
Represent data on two quantitative variables on a scatter plot, and describe how the variables are related. a. Fit a function to the data; use functions fitted to data to solve problems in the context of the data. b. Informally assess the fit of a function by plotting and analyzing residuals. c. Fit a linear function for a scatter plot that suggests a linear association.
A scatter plot shows paired data, like hours studied and test score. Students describe the direction (positive or negative), the form (linear or curved) and the strength (how close the points lie to a pattern).
When the points suggest a line, a line of best fit such as y = 4x + 58 can predict values. A residual is the observed value minus the predicted value. A positive residual means the point lies above the line, and a negative one means it lies below.
A residual plot checks the fit. If the residuals scatter randomly around 0, the model fits well. A curved pattern such as a U shape means a different kind of function would fit better. Predictions far outside the data, called extrapolations, are risky.
A student who has mastered S-ID.B.6 can:
- Describe the direction, form and strength of a scatter plot.
- Write a line through two data points and make predictions.
- Compute and interpret residuals.
- Judge a model’s fit from a residual plot.
- Use exponential and quadratic models fitted to data.
Worked examples
Example 1: A prediction
Use y = 4x + 58 to predict the score for 7 hours of study.
- y = 4(7) + 58.
Answer: 86
Example 2: A residual
A student studied 5 hours and scored 80. Find the residual for y = 4x + 58.
- Predicted: 4(5) + 58 = 78.
- Residual = 80 − 78.
Answer: 2
Example 3: A line through two points
A line passes through (10, 40) and (30, 20). What does it predict at x = 25?
- Slope = (20 − 40) ÷ (30 − 10) = −1.
- y = −x + 50.
- y = −25 + 50.
Answer: 25
Where this fits
This standard builds on middle school scatter plots and lines of fit (8.SP.A.1 to A.3) and on linear, exponential and quadratic functions (F-LE.A.2). It leads to interpreting models (S-ID.C.7) and correlation (S-ID.C.8).
Common misconceptions
| Misconception | What it looks like | How to address it |
|---|---|---|
| Residual sign reversed | The residual is computed as predicted − observed. | Residual = observed − predicted. |
| Fit judged by one point | A line is called good because it passes through one point. | Look at all the residuals together. |
| Patterns ignored | A U-shaped residual plot is accepted as a good fit. | A pattern means a curve would fit better. |
| Extrapolating freely | The model predicts a score for 20 hours of study. | Stay close to the range of the data. |
How to use the three levels
Practice describes a scatter plot of hours and scores, predicts with y = 4x + 58 and finds residuals. On Level writes a line through two points, uses exponential and quadratic models and describes the relationship in writing. Challenge fits lines from two points, works with residual sums and explains residual plots.
- Practice 1 and 2 and On Level 5 use the scatter plot.
- Practice 3 and 6 and On Level 2 compute residuals.
- On Level 6 to 8 and Challenge 4 use nonlinear models.
- Challenge 5 explains residual plots in writing.
Each level takes about 20 minutes.
State standards
This worksheet is written to Common Core HSS-ID.B.6. The table shows how 9 states and DC code the same skill, so you can match it to your own standards.
Show the state codes for Scatter Plots and Line of Best Fit
| State | State code | Match |
|---|---|---|
| Connecticut | HSS-ID.B.6 | Same |
| Delaware | HSS-ID.B.6 | Same |
| District of Columbia | HSS-ID.B.6 | Same |
| Hawaii | HSS-ID.B.6 | Same |
| Illinois | HSS-ID.B.6 | Same |
| Michigan | HSS-ID.B.6 | Same |
| Nevada | HSS-ID.B.6 | Same |
| New Hampshire | HSS-ID.B.6 | Same |
| New Mexico | HSS-ID.B.6 | Same |
| Vermont | HSS-ID.B.6 | Same |
Same: the state uses the Common Core standard as written. Adapted: the same skill in different words or scope. Partial: part of the skill. Different grade: the state teaches it in another grade. Codes come from each state’s official standards documents.
Keep practicing
Next, students interpret the slope and intercept of linear models. Albert’s Adaptive Math practice is free for teachers to assign, adjusts to each student and gives instant feedback on every question.