Breaking Down Design Problems Worksheets for Earth Science

These breaking down design problems worksheets for Earth Science give high school students 30 questions at three levels on splitting a big, messy problem into pieces engineering can solve. Students plan an island’s clean-power project, find the fastest schedule, split a school’s energy bill and a region’s emissions into targets and see why the pieces have to fit back together. The printable PDF is free, and the answer key is emailed to you.

Earth and Space Science · NGSS HS-ETS1-2

Breaking Down Design Problems Worksheet

3 levels · 30 problems · printable PDF

Download the free PDF

Practice: Builds the skill step by step.

  1. Why do engineers break a complex problem into smaller problems?
    A.Smaller problems are easier to understand, solve and test one at a time.
    B.It makes the project take longer on purpose.
    C.Small problems never need testing.
    D.It removes the need for criteria.
  2. A city wants to reduce flooding. Which is a smaller, more manageable subproblem?
    A.Stop all rain from falling
    B.Solve every city problem at once
    C.Measure how fast rainwater runs off each neighborhood’s streets
    D.Move the whole city
  3. Use the table. Which subproblems can start right away?
    Subproblem for an island’s clean-power planTime to solve (months)Must finish first
    A. Measure how much electricity the island uses2None
    B. Map wind and sunlight across the island3None
    C. Choose the mix of wind, solar and batteries2A and B
    D. Design the power grid upgrades4C
    E. Train local technicians3C
    A.A and B
    B.C and D
    C.D and E
    D.Only E
  4. Use the table. Which subproblem must wait for both A and B?
    Subproblem for an island’s clean-power planTime to solve (months)Must finish first
    A. Measure how much electricity the island uses2None
    B. Map wind and sunlight across the island3None
    C. Choose the mix of wind, solar and batteries2A and B
    D. Design the power grid upgrades4C
    E. Train local technicians3C
    A.D
    B.B
    C.E
    D.C
  5. Use the table. If A and B are done at the same time, how many months until both are finished?
    Subproblem for an island’s clean-power planTime to solve (months)Must finish first
    A. Measure how much electricity the island uses2None
    B. Map wind and sunlight across the island3None
    C. Choose the mix of wind, solar and batteries2A and B
    D. Design the power grid upgrades4C
    E. Train local technicians3C
  6. Which subproblem could engineering solve most directly when bringing clean water to a village?
    A.Changing the village’s weather
    B.Designing a pump that lifts well water to a storage tank
    C.Writing a history of the village
    D.Making people thirsty
  7. A project has 5 subproblems that each take 2 weeks. If they must be done one after another, how many weeks does the project take?
  8. Use P7. If 3 of those subproblems can be done at the same time and the other 2 must follow one at a time, how many weeks does the project take?
  9. Reducing a school’s energy use is a complex problem. Which list breaks it into good subproblems?
    A.Make the school better
    B.Buy new everything
    C.Lighting, heating and cooling, and computers left on overnight
    D.Close the school
  10. A community wants to reduce litter in a river. Break the problem into two smaller subproblems that engineering could solve. Make two points.

On Level: Grade-level practice.

  1. Use the table. What is the shortest time, in months, to finish all five subproblems if work runs in parallel whenever it can?
    Subproblem for an island’s clean-power planTime to solve (months)Must finish first
    A. Measure how much electricity the island uses2None
    B. Map wind and sunlight across the island3None
    C. Choose the mix of wind, solar and batteries2A and B
    D. Design the power grid upgrades4C
    E. Train local technicians3C
  2. Use the table. Which subproblem decides how long the project takes after C is finished?
    Subproblem for an island’s clean-power planTime to solve (months)Must finish first
    A. Measure how much electricity the island uses2None
    B. Map wind and sunlight across the island3None
    C. Choose the mix of wind, solar and batteries2A and B
    D. Design the power grid upgrades4C
    E. Train local technicians3C
    A.E, because it is shorter
    B.B, because it maps the island
    C.A, because it comes first
    D.D, because it is the longest of the steps that can run at that time
  3. Use the table. If D could be cut from 4 months to 3 months, how many months would the whole project take?
    Subproblem for an island’s clean-power planTime to solve (months)Must finish first
    A. Measure how much electricity the island uses2None
    B. Map wind and sunlight across the island3None
    C. Choose the mix of wind, solar and batteries2A and B
    D. Design the power grid upgrades4C
    E. Train local technicians3C
  4. A coastal city faces both flooding and drinking-water shortages. Make three points: one engineering subproblem about flooding, one about drinking water, and why separating them helps.
  5. Why must subproblems be fit back together at the end?
    A.The solutions must work together as one system, without causing new problems.
    B.Each solution can ignore the others.
    C.The pieces are never combined.
    D.Combining them makes testing unnecessary.
  6. A team designing an electric bus system splits it into batteries, charging stations and routes. The battery team picks a battery that needs a charger the station team didn’t plan for. What went wrong?
    A.Charging stations are not a subproblem.
    B.They broke the problem into too few pieces.
    C.The teams didn’t share the connections between their subproblems.
    D.Electric buses can’t work.
  7. A school’s energy bill is 120,000 dollars a year: lighting 30%, heating and cooling 50%, equipment 20%. How many dollars a year go to heating and cooling?
  8. Use O7. Which subproblem should the team tackle first if they want the biggest savings?
    A.Heating and cooling
    B.Lighting
    C.Equipment
    D.They all save the same
  9. Use O7. LED lights could cut the lighting cost by 60%. How many dollars a year would that save?
  10. Explain how breaking the school energy problem in O7 into subproblems helps the team decide what to do. Make two points.

Challenge: Multi-step and word problems that stretch it.

  1. A project’s subproblems take 4, 3, 5 and 2 weeks. The 4- and 3-week ones can run together; the 5-week one must follow both; the 2-week one must follow the 5-week one. How many weeks does the project take?
  2. Use C1. Which change would shorten the project most?
    A.Adding a new subproblem
    B.Cutting the 3-week subproblem to 1 week
    C.Cutting the 2-week subproblem to 1 week
    D.Cutting the 5-week subproblem to 3 weeks
  3. A region wants to cut its CO2 emissions in half by 2040. Break the problem into three subproblems that cover different sources. Make three points.
  4. Use C3. Why might the electricity subproblem need to be solved before the transportation one?
    A.Cars use no electricity.
    B.Electric vehicles only cut emissions a lot if the electricity they use comes from clean sources.
    C.Electricity has nothing to do with transportation.
    D.Transportation must always be solved first.
  5. Use C3. The region emits 10 million tonnes of CO2: 45% electricity, 35% transportation, 20% buildings. If the electricity subproblem cuts its share by 80%, how many million tonnes are saved?
  6. Use C5. If transportation is cut by 40%, how many million tonnes are saved from transportation?
  7. Use C5 and C6. The goal is to cut 5 million tonnes. Do the two cuts reach it?
    A.No; they total 2.2 million tonnes
    B.Yes; 3.6 + 1.4 = 5.0 million tonnes
    C.Yes; they total 7.5 million tonnes
    D.No; they total 4.0 million tonnes
  8. A student says breaking a problem into pieces is risky because the pieces might not fit together. Respond. Make two points.
  9. Which subproblem is NOT one engineering can solve directly?
    A.Building a stronger levee
    B.Programming a traffic light system
    C.Deciding which values a community should care about most
    D.Designing a cheaper water filter
  10. Why is a well-chosen subproblem easier to test?
    A.It has no criteria.
    B.It can only be tested at the very end.
    C.It never fails.
    D.It has its own clear criteria, so the team can tell whether that piece works.

Get the answer key with worked solutions

Assign free adaptive science practice in Albert →

What HS-ETS1-2 asks students to do

Design a solution to a complex real-world problem by breaking it down into smaller, more manageable problems that can be solved through engineering.

Problems like coastal flooding, clean power or cutting a region’s emissions are too big to solve in one step. Engineers break them into smaller subproblems, each with its own criteria, that can be designed and tested separately. Some subproblems can run at the same time; others must wait for results from earlier ones. At the end, the pieces have to work together as one system.

The standard asks students to design a solution by breaking a complex problem down. Students should be able to choose sensible subproblems, see which depend on others, and explain how solving the pieces adds up to solving the whole.

What mastery looks like:

  • A student breaks a complex problem into specific, solvable subproblems.
  • A student identifies which subproblems depend on others.
  • A student calculates the shortest schedule when some work runs in parallel.
  • A student uses data to decide which subproblem to tackle first.
  • A student explains why the pieces must be coordinated and recombined.

Key vocabulary

  • Subproblem: a smaller, manageable part of a complex problem
  • Dependency: a subproblem that cannot start until another is finished
  • Parallel work: subproblems done at the same time
  • Critical path: the chain of dependent steps that sets the shortest possible finish time
  • Integration: fitting the solved pieces back together into one working system

The model, step by step

The phenomenon: an island runs on diesel generators. Fuel is shipped in, power is expensive and every delivery adds CO2. The island wants clean power, but “switch to clean power” isn’t something an engineer can start on Monday. Where do you begin?

Subproblem Time (months) Must finish first
A. Measure how much electricity the island uses 2 None
B. Map wind and sunlight across the island 3 None
C. Choose the mix of wind, solar and batteries 2 A and B
D. Design the power grid upgrades 4 C
E. Train local technicians 3 C

The science and engineering practice is designing solutions. Breaking the problem down turns one impossible task into five doable ones.

  1. Claim: The island’s plan can be finished in 9 months, not the 14 months the steps add up to.
  2. Evidence: A and B can run together (3 months). C needs both (2 months, finishing at month 5). D and E can then run together, and D, at 4 months, takes longer.
  3. Reasoning: Running independent subproblems in parallel shortens the project. The longest chain, B → C → D, is the critical path, so shortening D would finish the project sooner.

A worked question: “A school’s energy bill is 120,000 dollars: lighting 30%, heating and cooling 50%, equipment 20%. LED lights cut lighting costs by 60%. How much is saved?” Lighting costs 0.30 × 120,000 = 36,000 dollars, and 0.60 × 36,000 = 21,600 dollars saved a year. Splitting the bill also shows heating and cooling is the biggest piece to tackle next.

Sticky-note project plan

Give groups a big problem card, like “cut a city’s food waste in half” or “protect a coastal road from flooding.” Groups write one subproblem per sticky note, add a time estimate and draw arrows for dependencies on chart paper. Then they find the critical path and present which subproblem they would speed up first, and why.

Common misconceptions

Misconception What it looks like How to address it
Breaking a problem down means splitting it evenly Students divide work into equal chunks. Split by what can be designed and tested separately.
Subproblems can be solved in any order Students start with designing the grid. Mark dependencies: you can’t choose a mix before measuring demand.
Solve the pieces and you’re done Students forget integration. Use the bus-and-charger example: pieces that don’t fit cause new problems.
Total time is the sum of all steps Students add every duration. Show how parallel work shortens the project.

How to use the three levels

The Practice level covers why engineers break problems down, picking good subproblems and simple schedules. Plan on about 15 minutes.

The On Level sheet matches the standard. Students schedule the island project, split a coastal city’s problems, prioritize a school’s energy bill and explain why teams must coordinate. Plan on 20 to 25 minutes.

The Challenge level finds critical paths, splits a region’s CO2 goal into sector targets, checks whether the targets add up and answers the claim that breaking problems down is risky. It works well for small groups, early finishers or review.

The answer key includes model answers and key points for every written question.

Keep practicing

For more practice that adjusts to each student, Albert’s adaptive science practice is free for teachers to assign, with instant feedback on every question.