Earth and Space Science Worksheets
Practice
Earth and Space Science Worksheets

Design Simulations Worksheets for Earth Science

These design simulations worksheets for Earth Science give high school students 30 questions at three levels on using computer simulations to test solutions before they’re built. Students compare four simulated traffic plans on commute time, CO2, ridership and cost, use repeated flood runs to size a levee and find where a simulation’s assumptions could break down. The printable PDF is free, and the answer key is emailed to you.

Earth and Space Science · NGSS HS-ETS1-4

Design Simulations Worksheet

3 levels · 30 problems · printable PDF

Download the free PDF

Practice: Builds the skill step by step.

  1. Why do engineers use computer simulations before building a large solution?
    A.Because simulations are always perfectly correct
    B.To avoid having any criteria
    C.To test how the solution affects the whole system cheaply and safely before spending money
    D.Because real tests are never allowed
  2. Use the table. Which plan gives the shortest average commute?
    Simulated plan for a downtownAverage commute (minutes)Bus riders per dayCO2 from traffic (tonnes per day)Cost (million dollars)
    Current streets328,0004000
    Add a bus-only lane3414,0003405
    Add a car lane297,00046040
    Congestion fee for cars2715,0003002
    A.Congestion fee for cars
    B.Add a car lane
    C.Add a bus-only lane
    D.Current streets
  3. Use the table. Which plan increases CO2 from traffic?
    Simulated plan for a downtownAverage commute (minutes)Bus riders per dayCO2 from traffic (tonnes per day)Cost (million dollars)
    Current streets328,0004000
    Add a bus-only lane3414,0003405
    Add a car lane297,00046040
    Congestion fee for cars2715,0003002
    A.None of the plans
    B.Add a car lane
    C.Congestion fee for cars
    D.Add a bus-only lane
  4. Use the table. How many more bus riders per day does the bus-only lane bring compared with current streets?
    Simulated plan for a downtownAverage commute (minutes)Bus riders per dayCO2 from traffic (tonnes per day)Cost (million dollars)
    Current streets328,0004000
    Add a bus-only lane3414,0003405
    Add a car lane297,00046040
    Congestion fee for cars2715,0003002
  5. Use the table. By how many tonnes per day does the congestion fee cut CO2 compared with current streets?
    Simulated plan for a downtownAverage commute (minutes)Bus riders per dayCO2 from traffic (tonnes per day)Cost (million dollars)
    Current streets328,0004000
    Add a bus-only lane3414,0003405
    Add a car lane297,00046040
    Congestion fee for cars2715,0003002
  6. In the simulation, adding a car lane also changes bus ridership. What does this show?
    A.Bus riders never change their plans.
    B.Simulations ignore people.
    C.Each part of a city works alone.
    D.Changes to one part of the system affect other parts.
  7. What is an input to a traffic simulation?
    A.The report it produces
    B.The commute time it predicts
    C.The CO2 it predicts
    D.The number of lanes on each street
  8. Use the table. What is the average of the five simulated peak river levels, in meters?
    Simulation runPeak river level at town (m)
    14.1
    24.6
    33.9
    44.4
    54.0
  9. Use the table. Why do the five runs give different peak levels?
    Simulation runPeak river level at town (m)
    14.1
    24.6
    33.9
    44.4
    54.0
    A.The river changes its length each run.
    B.The computer made random mistakes.
    C.Each run uses slightly different rainfall and conditions to show the range of possible outcomes.
    D.Only run 1 is correct.
  10. Use the traffic table. Name one criterion the bus-only lane meets well and one it does poorly on. Make two points.
    Simulated plan for a downtownAverage commute (minutes)Bus riders per dayCO2 from traffic (tonnes per day)Cost (million dollars)
    Current streets328,0004000
    Add a bus-only lane3414,0003405
    Add a car lane297,00046040
    Congestion fee for cars2715,0003002

On Level: Grade-level practice.

  1. Use the table. For the congestion fee, how many tonnes of CO2 per day are cut for each million dollars of cost?
    Simulated plan for a downtownAverage commute (minutes)Bus riders per dayCO2 from traffic (tonnes per day)Cost (million dollars)
    Current streets328,0004000
    Add a bus-only lane3414,0003405
    Add a car lane297,00046040
    Congestion fee for cars2715,0003002
  2. Use the table. For the bus-only lane, how many tonnes of CO2 per day are cut for each million dollars of cost?
    Simulated plan for a downtownAverage commute (minutes)Bus riders per dayCO2 from traffic (tonnes per day)Cost (million dollars)
    Current streets328,0004000
    Add a bus-only lane3414,0003405
    Add a car lane297,00046040
    Congestion fee for cars2715,0003002
  3. Use the table. The city’s criteria are: commute no longer than 33 minutes, CO2 under 350 tonnes per day, cost under 10 million dollars. Which plan meets all three?
    Simulated plan for a downtownAverage commute (minutes)Bus riders per dayCO2 from traffic (tonnes per day)Cost (million dollars)
    Current streets328,0004000
    Add a bus-only lane3414,0003405
    Add a car lane297,00046040
    Congestion fee for cars2715,0003002
    A.Add a bus-only lane
    B.Congestion fee for cars
    C.Add a car lane
    D.Current streets
  4. Use the table. Adding a car lane shortens commutes, but it also changes other parts of the system. Make two points: what happened to bus ridership and why, and what happened to CO2 and why.
    Simulated plan for a downtownAverage commute (minutes)Bus riders per dayCO2 from traffic (tonnes per day)Cost (million dollars)
    Current streets328,0004000
    Add a bus-only lane3414,0003405
    Add a car lane297,00046040
    Congestion fee for cars2715,0003002
  5. A simulation of a new dam shows it would cut floods downstream but also trap sediment and shrink a delta. What does this show about the solution?
    A.It has effects on other systems, so trade-offs must be weighed.
    B.The dam has no drawbacks.
    C.Simulations can’t model sediment.
    D.Floods and deltas are unrelated.
  6. Use the table in P8. A levee is designed to hold back water up to 4.5 m. In how many of the five runs would the river go over it?
    Simulation runPeak river level at town (m)
    14.1
    24.6
    33.9
    44.4
    54.0
  7. Use O6. In what percent of the runs does the levee hold?
    Simulation runPeak river level at town (m)
    14.1
    24.6
    33.9
    44.4
    54.0
  8. Use O6 and O7. The town wants the levee to hold in every run. What should the designers do next?
    Simulation runPeak river level at town (m)
    14.1
    24.6
    33.9
    44.4
    54.0
    A.Lower the levee to 4.0 m
    B.Raise the design height above 4.6 m and run the simulation again
    C.Stop using the simulation
    D.Delete run 2
  9. Why must engineers check a simulation against real-world data?
    A.A simulation is only useful if it reproduces what actually happens.
    B.Real data always matches any simulation.
    C.Simulations never need checking.
    D.Real data is always wrong.
  10. A simulation predicts a solar canopy over a parking lot makes 1,200 MWh a year and cuts the lot’s summer temperature by 4 °C. If the city buys electricity at 90 dollars per MWh, how many dollars a year does the canopy save?

Challenge: Multi-step and word problems that stretch it.

  1. Use the traffic table. Recommend one plan for the city, using at least two criteria and one constraint. Make two points.
    Simulated plan for a downtownAverage commute (minutes)Bus riders per dayCO2 from traffic (tonnes per day)Cost (million dollars)
    Current streets328,0004000
    Add a bus-only lane3414,0003405
    Add a car lane297,00046040
    Congestion fee for cars2715,0003002
  2. A simulation predicts the congestion fee works, but it assumes drivers have good bus options. What should the city check?
    A.Whether cars can be painted different colors
    B.Whether the fee is easy to pronounce
    C.Whether the simulation’s font is readable
    D.Whether the bus system can carry the extra 7,000 riders a day
  3. Use the traffic table. If the bus system can only add 4,000 riders a day beyond current streets, how many of the congestion fee’s projected riders could not be carried?
    Simulated plan for a downtownAverage commute (minutes)Bus riders per dayCO2 from traffic (tonnes per day)Cost (million dollars)
    Current streets328,0004000
    Add a bus-only lane3414,0003405
    Add a car lane297,00046040
    Congestion fee for cars2715,0003002
  4. Use C3. Explain how a constraint in one subsystem could change the simulated outcome of the congestion fee. Make two points.
  5. A wildfire simulation finds that clearing brush within 30 m of homes cuts houses lost from 120 to 45. What percent fewer houses are lost?
  6. Use C5. The same simulation shows the cleared areas increase soil erosion on steep slopes. What is the best next step?
    A.Ignore erosion because fewer houses burn
    B.Stop clearing brush everywhere
    C.Simulate a refined plan, such as leaving low ground cover on steep slopes, and compare the results
    D.Clear brush within 300 m instead
  7. Use the table in P8. If the design height is 4.7 m, in what percent of the runs does the river stay below it?
    Simulation runPeak river level at town (m)
    14.1
    24.6
    33.9
    44.4
    54.0
  8. Five runs is a small sample. Why might engineers run the flood simulation 1,000 times?
    A.To better estimate how often rare, extreme floods could happen
    B.Because more runs always lower the river
    C.To make the results exactly the same
    D.Because 5 runs is too many
  9. Describe two limitations of using a computer simulation to choose a solution. Make two points.
  10. Which result from a simulation would best show interactions between systems?
    A.A road gets longer when more asphalt is added.
    B.A bus holds 60 people.
    C.A dam is made of concrete.
    D.Cutting a forest for a road increases runoff, which raises flood levels in a town downstream.

Get the answer key with worked solutions

Assign free adaptive science practice in Albert →

What HS-ETS1-4 asks students to do

Use a computer simulation to model the impact of proposed solutions to a complex real-world problem with numerous criteria and constraints on interactions within and between systems relevant to the problem.

Big solutions are too expensive to build just to see if they work. Engineers use computer simulations to try them first: a traffic model shows what a new lane does to commutes, bus ridership and emissions; a flood model shows how high a river could rise. Running the model many times, with slightly different conditions, shows the range of outcomes.

The standard asks students to use a simulation to model a solution’s impact on interactions within and between systems, against many criteria and constraints. Students should be able to read simulation output, check plans against criteria, notice effects that spread from one system to another and question the model’s assumptions.

What mastery looks like:

  • A student compares simulated plans on several criteria at once.
  • A student checks which plans meet every criterion and constraint.
  • A student explains how a change in one part of a system affects another.
  • A student uses repeated runs to judge how often a design would fail.
  • A student names a simulation’s assumptions and limits.

Key vocabulary

  • Simulation: a computer model that predicts how a system behaves
  • Input: a value the user sets, such as the number of lanes
  • Output: what the simulation predicts, such as commute time
  • Run: one pass of a simulation with a given set of conditions
  • Assumption: something a model takes as true, which may not hold in reality

The model, step by step

The phenomenon: cities have added lanes to crowded highways for decades, yet traffic often fills the new lanes within a few years. Why would adding road space not fix congestion for long, and how could a city find out before spending 40 million dollars?

Simulated plan Average commute (minutes) Bus riders per day CO2 from traffic (tonnes per day) Cost (million dollars)
Current streets 32 8,000 400 0
Add a bus-only lane 34 14,000 340 5
Add a car lane 29 7,000 460 40
Congestion fee for cars 27 15,000 300 2

The science and engineering practice is using mathematics and computational thinking: running and reading a model to compare designs.

  1. Claim: The congestion fee is the best plan in this simulation.
  2. Evidence: It gives the shortest commute (27 minutes), the lowest CO2 (300 tonnes a day) and the most bus riders, for 2 million dollars. The car lane shortens commutes but raises CO2 to 460 tonnes and costs 40 million.
  3. Reasoning: The model links the road system, the bus system and the atmosphere. A fee pushes some drivers onto buses, which cuts traffic and emissions together. The result depends on the assumption that buses can carry the extra 7,000 riders, so that needs checking.

A worked question: “Five flood runs give peak river levels of 4.1, 4.6, 3.9, 4.4 and 4.0 m. A levee holds water up to 4.5 m. In what percent of runs does it hold?” Only the 4.6 m run goes over, so it holds in 4 of 5 runs, or 80%. A design height above 4.6 m holds in all five, and more runs would show how often rare floods might go higher.

Run a simple simulation

Have pairs simulate a levee with a die: each roll adds that many tenths of a meter to a base river level of 3.5 m. They roll 20 storms, record the peaks and find what percent go over a 4.0 m levee. Then they raise the levee to 4.1 m and re-run. Close by comparing 20 runs with the class total of hundreds, and talk about why rare events need many runs.

Common misconceptions

Misconception What it looks like How to address it
Simulations show the future exactly Students treat 27 minutes as a promise. Talk about assumptions and run-to-run variation.
One run is enough Students design to the average flood. Use the five runs: designing to the average fails in some storms.
Each part of a system acts alone Students don’t see why a car lane changes bus ridership. Trace the chain from lane to driving to ridership to CO2.
If a model has numbers, it’s right Students skip checking against reality. Ask how the model would be tested against real traffic counts.

How to use the three levels

The Practice level covers why engineers simulate, reading a results table and inputs versus outputs. Plan on about 15 minutes.

The On Level sheet matches the standard. Students compare plans by CO2 cut per dollar, check every criterion, trace effects across systems and size a levee from repeated runs. Plan on 20 to 25 minutes.

The Challenge level recommends a plan with criteria and a constraint, tests a hidden bus-capacity limit, weighs a wildfire plan’s side effects and names a simulation’s limits. It works well for small groups, early finishers or review.

The answer key includes model answers and key points for every written question.

Keep practicing

For more practice that adjusts to each student, Albert’s adaptive science practice is free for teachers to assign, with instant feedback on every question.

Ready to practice? Try Albert free.

Build real confidence with thousands of adaptive practice questions across AP®, SAT®, ACT®, and core subjects — aligned to what you’re studying right now.