Design Trade-offs Worksheets for Earth Science

These design trade-offs worksheets for Earth Science give high school students 30 questions at three levels on choosing among solutions when no design wins on everything. Students score three flood-protection designs in a weighted decision matrix, see how changing priorities changes the winner, compare bridges by life-cycle cost and weigh safety, cost, reliability and environmental impact. The printable PDF is free, and the answer key is emailed to you.

Earth and Space Science · NGSS HS-ETS1-3

Design Trade-offs Worksheet

3 levels · 30 problems · printable PDF

Download the free PDF

Practice: Builds the skill step by step.

  1. What is a trade-off in engineering?
    A.A test that always passes
    B.Giving up some of one quality to gain more of another
    C.A solution that meets every criterion perfectly
    D.A rule that cannot be broken
  2. Why do engineers give criteria different weights?
    A.Some criteria matter more than others for the problem.
    B.To make the math harder
    C.Because every criterion is equally important
    D.To avoid making a decision
  3. Use the table. What is the sea wall’s weighted score for flood protection?
    Criterion (weight)Sea wallRestored wetlandRaised buildings
    Flood protection (×3)534
    Cost (×2)243
    Environmental impact (×2)153
    Appearance (×1)253
  4. Use the table. What is the restored wetland’s weighted score for environmental impact?
    Criterion (weight)Sea wallRestored wetlandRaised buildings
    Flood protection (×3)534
    Cost (×2)243
    Environmental impact (×2)153
    Appearance (×1)253
  5. Use the table. What is the sea wall’s total weighted score?
    Criterion (weight)Sea wallRestored wetlandRaised buildings
    Flood protection (×3)534
    Cost (×2)243
    Environmental impact (×2)153
    Appearance (×1)253
  6. Use the table. What is the restored wetland’s total weighted score?
    Criterion (weight)Sea wallRestored wetlandRaised buildings
    Flood protection (×3)534
    Cost (×2)243
    Environmental impact (×2)153
    Appearance (×1)253
  7. Use the table. Which criterion has the highest priority?
    Criterion (weight)Sea wallRestored wetlandRaised buildings
    Flood protection (×3)534
    Cost (×2)243
    Environmental impact (×2)153
    Appearance (×1)253
    A.Environmental impact
    B.Appearance
    C.Flood protection
    D.Cost
  8. Which is a social or cultural impact a coastal project should consider?
    A.The speed of light
    B.The melting point of concrete
    C.The density of seawater
    D.Whether it blocks a beach that the community uses for fishing and gatherings
  9. Which pair shows a trade-off?
    A.A design with no cost and no strength
    B.A cheaper design that is also stronger
    C.Two identical designs
    D.A stronger bridge design that also costs more
  10. Use the table. Name one strength and one weakness of the sea wall. Make two points.
    Criterion (weight)Sea wallRestored wetlandRaised buildings
    Flood protection (×3)534
    Cost (×2)243
    Environmental impact (×2)153
    Appearance (×1)253

On Level: Grade-level practice.

  1. Use the table. What is the raised buildings’ total weighted score?
    Criterion (weight)Sea wallRestored wetlandRaised buildings
    Flood protection (×3)534
    Cost (×2)243
    Environmental impact (×2)153
    Appearance (×1)253
  2. Use the table. Which solution ranks highest overall with these weights?
    Criterion (weight)Sea wallRestored wetlandRaised buildings
    Flood protection (×3)534
    Cost (×2)243
    Environmental impact (×2)153
    Appearance (×1)253
    A.Restored wetland
    B.Sea wall
    C.Raised buildings
    D.They are tied
  3. Use the table. A city decides flood protection matters even more and changes its weight to ×5. What is the sea wall’s new total?
    Criterion (weight)Sea wallRestored wetlandRaised buildings
    Flood protection (×3)534
    Cost (×2)243
    Environmental impact (×2)153
    Appearance (×1)253
  4. Use the table and O3’s change. What is the restored wetland’s new total?
    Criterion (weight)Sea wallRestored wetlandRaised buildings
    Flood protection (×3)534
    Cost (×2)243
    Environmental impact (×2)153
    Appearance (×1)253
  5. Use O3 and O4. Explain what changing the weights shows about choosing a design. Make two points.
    Criterion (weight)Sea wallRestored wetlandRaised buildings
    Flood protection (×3)534
    Cost (×2)243
    Environmental impact (×2)153
    Appearance (×1)253
  6. Use the table. Over 75 years, what is the total cost of the concrete bridge, in million dollars (build cost plus upkeep)?
    CriterionSteel bridgeConcrete bridge
    Cost (million dollars)129
    Expected life (years)10075
    Yearly upkeep (thousand dollars)8050
    Build time (months)1016
  7. Use the table. Over 100 years, what is the total cost of the steel bridge, in million dollars?
    CriterionSteel bridgeConcrete bridge
    Cost (million dollars)129
    Expected life (years)10075
    Yearly upkeep (thousand dollars)8050
    Build time (months)1016
  8. Use O6 and O7. What is each bridge’s total cost per year of life, in million dollars? Give steel first.
    CriterionSteel bridgeConcrete bridge
    Cost (million dollars)129
    Expected life (years)10075
    Yearly upkeep (thousand dollars)8050
    Build time (months)1016
  9. Use the table. A town needs a bridge open as soon as possible because the old one is closed. Which bridge fits that priority, and what is the trade-off?
    CriterionSteel bridgeConcrete bridge
    Cost (million dollars)129
    Expected life (years)10075
    Yearly upkeep (thousand dollars)8050
    Build time (months)1016
    A.Concrete; it lasts longer.
    B.Steel; it is built 6 months faster but costs more to build.
    C.Concrete; it is faster and cheaper.
    D.Steel; it is cheaper to build.
  10. Which is a reliability criterion for a flood barrier?
    A.It must be painted green.
    B.It must be built by spring.
    C.It must work in at least 99 out of 100 storms.
    D.It must be cheap.

Challenge: Multi-step and word problems that stretch it.

  1. A safety review finds the restored wetland would take 10 years to grow strong enough to protect the town. Evaluate whether it is still the best choice. Make two points.
  2. Use the table. A planner adds a safety criterion with weight ×4. Scores: sea wall 5, wetland 2, raised buildings 4. What is the wetland’s new total (with the original weights for the other criteria)?
    Criterion (weight)Sea wallRestored wetlandRaised buildings
    Flood protection (×3)534
    Cost (×2)243
    Environmental impact (×2)153
    Appearance (×1)253
  3. Use C2. What is the sea wall’s new total?
    Criterion (weight)Sea wallRestored wetlandRaised buildings
    Flood protection (×3)534
    Cost (×2)243
    Environmental impact (×2)153
    Appearance (×1)253
  4. Use the table and C2. What is the raised buildings’ new total?
    Criterion (weight)Sea wallRestored wetlandRaised buildings
    Flood protection (×3)534
    Cost (×2)243
    Environmental impact (×2)153
    Appearance (×1)253
  5. Use C2, C3 and C4. What does adding the safety criterion do to the ranking?
    Criterion (weight)Sea wallRestored wetlandRaised buildings
    Flood protection (×3)534
    Cost (×2)243
    Environmental impact (×2)153
    Appearance (×1)253
    A.The sea wall and raised buildings tie for first, ahead of the wetland.
    B.The wetland stays in first place.
    C.All three designs tie.
    D.The sea wall wins by itself.
  6. Two designs tie after the safety criterion is added. Describe two fair ways to break the tie. Make two points: one way that involves the people affected, and one way that uses more data.
  7. Which impact would most likely be overlooked if a team scored only cost and flood protection?
    A.How well it stops floods
    B.Loss of habitat for birds and fish along the coast
    C.The project’s price
    D.The amount of concrete purchased
  8. A design scores 4 on a criterion weighted ×3, and a rival scores 5. How many weighted points does the rival gain on that criterion?
  9. Why should engineers write down their weights and scores?
    A.So no one can change the decision
    B.To hide the trade-offs
    C.So others can see the reasoning, question it and check the trade-offs
    D.Because numbers are always correct
  10. Which statement about the best design is most accurate?
    A.The cheapest design is always best.
    B.The newest technology is always best.
    C.One design is always best for every community.
    D.It depends on the criteria, their priorities and the constraints, so there may be no perfect design.

Get the answer key with worked solutions

Assign free adaptive science practice in Albert →

What HS-ETS1-3 asks students to do

Evaluate a solution to a complex real-world problem based on prioritized criteria and trade-offs that account for a range of constraints, including cost, safety, reliability, and aesthetics, as well as possible social, cultural, and environmental impacts.

Real design problems almost never have a solution that wins on every criterion. A sea wall may protect best but cost the most and harm the shoreline; a restored wetland may be cheaper and better for wildlife but protect less. Engineers handle this by ranking criteria, giving them weights and scoring each option, so the trade-offs are out in the open.

The standard lists the range of constraints to consider: cost, safety, reliability and aesthetics, plus social, cultural and environmental impacts. Students should be able to build and read a decision matrix, see how the result depends on the weights and explain why the best design depends on whose priorities count.

What mastery looks like:

  • A student calculates weighted scores and totals in a decision matrix.
  • A student explains how changing weights can change the best choice.
  • A student compares options by life-cycle cost, not just build cost.
  • A student names social, cultural or environmental impacts a matrix might miss.
  • A student proposes a fair way to settle a close decision.

Key vocabulary

  • Trade-off: giving up some of one quality to gain more of another
  • Decision matrix: a table that scores options against weighted criteria
  • Weight: a number that shows how much a criterion matters
  • Life-cycle cost: the total cost of building and running a solution over its life
  • Reliability: how consistently a solution works when it is needed

The model, step by step

The phenomenon: after a hurricane floods a coastal town, residents split. Some want a concrete sea wall right away; others want to restore the marsh that used to buffer storms. Both sides have good reasons. How can the town decide fairly?

Criterion (weight) Sea wall Restored wetland Raised buildings
Flood protection (×3) 5 3 4
Cost (×2) 2 4 3
Environmental impact (×2) 1 5 3
Appearance (×1) 2 5 3

The science and engineering practice is constructing explanations and designing solutions: evaluating designs against prioritized criteria.

  1. Claim: With these weights, the restored wetland is the strongest choice.
  2. Evidence: Totals are wetland 32, raised buildings 27 and sea wall 23. The wetland scores well on cost, environment and appearance.
  3. Reasoning: The weights reflect the town’s priorities. If flood protection rises to ×5, the wetland still leads (38 to 33), but if a heavily weighted safety criterion is added, the sea wall and raised buildings tie at the top. The best design depends on the priorities, so they must be agreed on openly.

A worked question: “A concrete bridge costs 9 million dollars and 50 thousand dollars a year in upkeep, and lasts 75 years. What is its life-cycle cost per year?” 9 + 0.05 × 75 = 12.75 million dollars over its life, and 12.75 ÷ 75 = 0.17 million dollars a year. A steel bridge at 12 million plus 80 thousand a year for 100 years works out to 0.2 million a year.

Town hall decision matrix

Assign students roles: a homeowner on the shore, a fishing family, a town budget officer, a wildlife biologist and a business owner. Each role sets its own weights for the flood-protection matrix and finds its winner. Then the class negotiates one shared set of weights, recalculates and discusses who gave something up.

Common misconceptions

Misconception What it looks like How to address it
The best design is the one that does one thing best Students pick the sea wall for protection alone. Score every criterion and total the weights.
Weights are objective Students treat weights as facts. Show how different groups’ weights change the winner.
Build cost is the real cost Students pick the cheaper bridge to build. Add upkeep and divide by lifespan.
Numbers capture everything Students ignore a beach that the community uses. Ask what the matrix leaves out: cultural and social impacts.

How to use the three levels

The Practice level covers trade-offs, weights and calculating weighted scores and totals. Plan on about 15 minutes.

The On Level sheet matches the standard. Students rank three designs, change a weight and recalculate, compare two bridges by life-cycle cost and match a design to a priority. Plan on 20 to 25 minutes.

The Challenge level adds a safety criterion that creates a tie, weighs a wetland’s slow start and asks for fair ways to break the tie. It works well for small groups, early finishers or review.

The answer key includes model answers and key points for every written question.

Keep practicing

For more practice that adjusts to each student, Albert’s adaptive science practice is free for teachers to assign, with instant feedback on every question.

Ready to practice? Try Albert free.

Build real confidence with thousands of adaptive practice questions across AP®, SAT®, ACT®, and core subjects — aligned to what you’re studying right now.